Term |
Description |
Term |
Description |
Dsc |
Discrepancy |
Gn |
Generator |
Dsch |
Discharge |
Gnd |
Ground |
Dur |
Duration |
Gr |
Group |
Dv |
Deviation |
Grd |
Guard |
EC |
Earth Coil |
Grn |
Green |
Echo |
Echo |
Gri |
Grid |
EE |
External equipment |
Gust |
Gust |
EF |
Earth fault |
H |
Harmonics (phase-related) |
Emg |
Emergency |
H2 |
Hydrogen |
Ems |
Emissions |
H2O |
Water |
En |
Energy |
Ha |
Harmonics (non-phase-related) |
Ena |
Enabled |
Health |
Health |
End |
End |
Heat |
Heater, heating |
Env |
Environment |
Hi |
High, highest |
Eq |
Equalization, equal |
Hor |
Horizontal |
Err |
Error |
HP |
Hot point |
Ev |
Evaluation |
Hum |
Humidity |
Evt |
Event |
Hy |
Hydraulics, hydraulic system |
Ex |
External |
Hyd |
Hydrological, hydro, water |
Exc |
Exceeded |
Hz |
Frequency |
Excl |
Exclusion |
I |
Integral |
Exp |
Expired |
Imb |
Imbalance |
Ext |
Excitation |
Imp |
Impedance non-phase-related |
F |
Float |
In |
Input |
FA |
Fault arc |
Ina |
Inactivity |
Fact |
Factor |
Iner |
Inertia |
Fail |
Failure |
Incr |
Increment |
Fan |
Fan |
Ind |
Indication |
Fer |
Frame error rate |
Inh |
Inhibit |
Fil |
Filter, filtration |
Ins |
Insulation |
Fish |
Fish |
Insol |
Insolation |
Fid |
Field |
Int |
Integer |
Fil |
Fall |
Intr |
Interrupt, interruption |
Flood |
Flood |
Intv |
Interval |
Fit |
Fault |
ISCSO |
Integer status controllable status output |
Flush |
Flush |
К |
Constant |
Flw |
Flow |
Kck |
Kicker |
FPF |
Forward power flow |
Key |
Key |
Fu |
Fuse |
km |
Kilometre |
Full |
Full |
L |
Lower |
Fwd |
Forward |
Last |
Last |
Gas |
Gas |
Ld |
Lead |
Gen |
General |
LD |
Logical device |
Go |
Goose |
LDC |
Line drop compensation |
GoCBRef |
Goose control block reference (see IEC 61850-7-2) |
LDCR |
Line drop compensation resistance |
Term |
Description |
Term |
Description |
LDCX |
Line drop compensation reactance |
Nit |
Nitrogen |
LDCZ |
Line drop compensation impedance |
Ng |
Negative |
Leak |
Leakage |
Nom |
Nominal, normalising |
LED |
Light-emitting diode |
Num |
Number |
Len |
Length |
NSQ |
Average partial discharge current |
Lev |
Level |
02 |
Oxygen |
Lg |
Lag |
03 |
Ozon, trioxygen |
Lim |
Limit |
Ofs |
Offset |
Lin |
Line |
Oil |
Oil |
Liv |
Live |
Oo |
Out of |
LN |
Logical node |
Op |
Operate, operating |
Lo |
Low |
Opn |
Open |
LO |
Lockout |
Out |
Output |
Loc |
Local |
Ov |
Over, override, overflow |
Lod |
Load, loading |
Ovl |
Overload |
Lok |
Locked |
P |
Proportional |
Loop |
Loop |
Pa |
Partial |
Los |
Loss |
Pap |
Paper |
Lst |
List |
Par |
Parallel |
LTC |
Load tap changer |
Pct |
Percent, percentage |
M |
Minutes |
Per |
Periodic, period |
M/O/C Made |
Data object is mandatory or optional or conditional Made |
PF Ph |
Power factor Phase Acidity, value of pH |
PH |
|||
Mag |
Magnetic, magnitude |
PhsA |
Phase L1 |
Max |
Maximum |
PhsB |
Phase L2 |
Mbr |
Membrane |
PhsC |
Phase L3 |
Mem |
Memory |
PNV |
Phase-to-neutral voltage |
Min Mir |
Minimum Mirror |
Phy |
Physical Instantaneous P |
Pi |
|||
Mlt |
Multiplier, multiple |
Pls |
Pulse |
Mod |
Mode |
Pit |
Plate, long-term flicker severity |
Month Mot |
Month Motor |
Pmp |
Pump Polar |
Po |
|||
Ms Mst |
Milliseconds Moisture |
Pol |
Polarizing Position |
Pos |
|||
MT |
Main tank |
Position phase L1 |
|
PosA |
|||
Mth |
Method |
Position phase L2 |
|
PosB |
|||
Mvm N2 |
Movement, moving Nitrogen dioxide |
PosC |
Position phase L3 Potentiometer |
Pot |
|||
Nam |
Name |
Point on wave switching |
|
POW |
|||
Name |
Name (see Note) |
PP |
Phase to phase |
NdsCom |
Needs commissioning (see IEC 61850-7-2) |
ppm |
Parts per million |
Net |
Net sum |
PPV |
Phase to phase voltage |
Neut |
Neutral |
Pre |
Pre- |
Term |
Description |
Term |
Description |
Pres |
Pressure |
S1 |
Step one |
Prg |
Progress, in progress |
S10 |
coefficient Si о |
Pri |
Primary |
S12 |
coefficient Si 2 |
Pro |
Protection |
S2 |
Step two |
Proxy |
Proxy |
Sar |
Surge arrestor |
Prt |
Parts, part |
Sat |
Saturation |
Ps |
Positive |
Sbs |
Subscription |
Pst |
Post, short-term flicker severity |
Sch |
Scheme |
Pt |
Point |
Sco |
Supply change over |
Pwr |
Power |
SCSM |
Specific communication service mapping |
Qty |
Quantity |
Sec |
Security |
R |
Raise |
Sei |
Select |
RO |
Zero sequence resistance |
Seq |
Sequence |
Rat |
Ratio |
Set |
Setting |
Red |
Record, recording |
Sig |
Signal |
Rch |
Reach |
Sign |
Sign |
Rcl |
Reclaim |
Sim |
Simulation, simulated |
Ret |
Reaction |
Sh |
Shunt |
Rdy |
Ready |
Sint |
Salinity, saline content |
Re |
Retry |
Smok |
Smoke |
React |
Reactance, reactive |
Snr |
Signal to noise ratio |
Rec |
Reclose |
Snw |
Snow |
Rect |
Rectifier |
Spd |
Speed |
Red |
Reduction, redundant |
Spec |
Spectra |
Ref |
Reference |
SPI |
Single pole |
Rei |
Release |
SPCSO |
Single point controllable status output |
Rem |
Remote |
Spt |
Setpoint |
Res |
Residual |
Src |
Source |
Reso |
Resonance |
St |
Status, state |
Rev |
Revision |
Sta |
Station |
Rf |
Refreshment |
Step |
Step |
Ris |
Resistance |
Sto |
Storage e.g. activity of storing data |
RI |
Relation, relative |
Stat |
Statistics |
Rmp |
Ramping, ramp |
Stop |
Stop |
RMS |
Root mean square |
Std |
Standard |
Rnbk |
Runback |
Stk |
Stroke |
Rot |
Rotation, rotor |
Str |
Start |
Rs |
Reset, resetable |
Stuck |
Stuck |
Rsl |
Result |
Sup |
Supply |
Rst |
Restraint, restriction |
Svc |
Service |
Rsv |
Reserve |
SvCBRef |
SV control block reference (see IEC 61850-7-2) |
Rte |
Rate |
Sw |
|
Switch, switched |
|||
Rtg |
Rating |
|
|
Rv |
Reverse |
Swg |
Swing |
Rx |
Receive, received |
Syn |
Synchronisation |
|
- |
Tap |
Tap |
Term |
Description |
Term |
Description |
Td |
Total distortion |
Ver |
Vertical |
Tdf |
Transformer derating factor |
Vbr |
Vibration |
Tdp |
Td’ |
Viol |
Violation |
TdOP |
TdO’ |
Vise |
Viscosity |
TdOS |
TdO” |
Vim |
Volume |
Tds |
Td" |
Vlv |
Valve |
Term |
Termination |
Vol |
Voltage non-phase-related |
Test |
Test |
Volts |
Voltage |
Tgt |
Target |
VT |
Voltage transducer |
Thd |
Total harmonic distortion |
W |
Active power |
Thm |
Thermal |
Wac |
Watchdog |
TiF |
Telephone influence factor |
Watt |
Active power non-phase-related |
|
Time Tmh = Time in h |
Wav |
Wave, waveform |
Tm |
Tmm = Time in min |
Wd |
Wind |
Tmp Tnk To Tot TP Tpc Tqp TqOp TqOs Tqs Tr Trd |
Tms = Time in s Tmms = Time in ms Temperature (°С) Tank Top Total Three pole Teleprotection Tq’ TqO’ TqO" Tq ” Trip Trade |
Week Wei Wh Wid Win Wrm Wrn XO X1 X2 Xd Xdp Xds |
Week Weak end infeed Watt hours Width Window Warm Warning Zero sequence reactance Positive sequence reactance Negative sequence reactance X2 synchronous reactance Xd transient synchronous reactance Xd' Reactance Xd" |
Trip Trg Trk Trs Ts Tu Tun Tx Тур Uhf |
Trip Trigger Track, tracking Transient Total signed Total unsigned Transmit, transmitted Type Ultra-high-frequency |
Xq Xqp Xqs Year Z zo Z1 Zer Zn Zro NOTE |
synchronous reactance Xq transient reactance sub-transient reactance Xq" Year Impedance Zero sequence impedance Positive sequence impedance Zero Zone Zero sequence method The abbreviation “Name” should only be used |
Un Up V VA Va Vac Vai VAr |
Under Up, upwards Voltage Volt amperes Variation Vacuum Value Volt amperes reactive |
in data object EEName and LNName. |
Logical node classes
Logical node groups
Logical nodes are grouped according to the logical node groups listed in Table 1. The names of logical nodes shall begin with the character representing the group to which the logical node belongs. For modelling per phase (for example switches or instrument transformers), one instance per phase shall be created; for modelling protection per zone or level, one instance per zone or level shall be created also.
Table 1 - List of logical node groups
Group indicator |
Logical node groups |
A |
Automatic control |
В |
Reserved |
C |
Supervisory control |
D |
Distributed energy resources |
E |
Reserved |
F |
Functional blocks |
G |
Generic function references |
H |
Hydro power |
I |
Interfacing and archiving |
J |
Reserved |
Ka |
Mechanical and non-electrical primary equipment |
L |
System logical nodes |
M |
Metering and measurement |
N |
Reserved |
0 |
Reserved |
P |
Protection functions |
Q |
Power quality events detection related |
R |
Protection related functions |
Sa |
Supervision and monitoring |
Ta |
Instrument transformer and sensors |
U |
Reserved |
V |
Reserved |
W |
Wind power |
Xа |
Switchgear |
Ya |
Power transformer and related functions |
Za |
Further (power system) equipment |
a LNs of this group exist in dedicated lEDs if a process bus is used. Without a process bus, LNs of this group are the I/Os in the hardwired IED one level higher (for example in a bay unit) representing the external device by its inputs and outputs (process image). |